ENVID

As part of the HyNet North West Low Carbon Project, Eni will develop and operate offshore and onshore transportation and storage of CO2 captured from industrial sites in Northwest England at the Liverpool Bay offshore oil and gas facilities in line with its mission to transition towards a low-carbon future.Â

The Protos pipeline is one of several pipelines being installed as part of the Carbon Capture network.

Client
Eni
Industry
Carbon Capture and Storage
Location
United Kingdom
Services
HAZID
ENVID
HAZOP
SIL Classification (via Risk Graph)
SIMOPS
Project Risk Assessment
Year
2024
Client
  • Eni
Industry
  • Carbon Capture and Storage
Location
  • United Kingdom
Services
  • ENVID
  • HAZID
  • HAZOP
  • Project Risk Assessment
  • SIL Classification (via Risk Graph)
  • SIMOPS
Year
  • 2024

The challenge

To address potential risks and hazards associated with the project during the Front End Engineering Design (FEED) phase, Process Risk Consulting were commissioned to facilitate the Project Risk Assessment, Hazard Identification (HAZID), Environmental Identification (ENVID), Simultaneous Operations (SIMOPS), Hazard and Operability (HAZOP) and Safety Integrity Level (SIL) Allocation Workshops , in line with ENI Guidelines for the Protos pipeline and associated facilities.

The scope of workshop included all of the onshore transport and storage facilities including several onshore pipelines and Above Ground Installations (AGI’s).

As part of the HyNet North West Low Carbon Project, Eni will develop and operate offshore and onshore transportation and storage of CO2 captured from industrial sites in Northwest England at the Liverpool Bay offshore oil and gas facilities in line with its mission to transition towards a low-carbon future.Â

The Runcorn pipeline is one of several pipelines being installed as part of the Carbon Capture network.

Client
Eni
Industry
Carbon Capture and Storage
Location
United Kingdom
Services
HAZID
ENVID
HAZOP
SIL Classification (via Risk Graph)
SIMOPS
Project Risk Assessment
Year
2024
Client
  • Eni
Industry
  • Carbon Capture and Storage
Location
  • United Kingdom
Services
  • ENVID
  • HAZID
  • HAZOP
  • Project Risk Assessment
  • SIL Classification (via Risk Graph)
  • SIMOPS
Year
  • 2024

The challenge

To address potential risks and hazards associated with the project during the Front End Engineering Design (FEED) phase, Process Risk Consulting were commissioned to facilitate the Project Risk Assessment, Hazard Identification (HAZID), Environmental Identification (ENVID), Simultaneous Operations (SIMOPS), Hazard and Operability (HAZOP) and Safety Integrity Level (SIL) Allocation Workshops , in line with ENI Guidelines for the Runcorn pipeline and associated facilities.

The scope of workshop included all of the onshore transport and storage facilities including several onshore pipelines and Above Ground Installations (AGI’s).

As part of the UK’s target to reach net-zero, e-Alto aims to produce Sustainable Aviation Fuel (SAF) from carbon dioxide and hydrogen made using renewable (decarbonised) electricity.

Client
Velocys
Industry
Sustainable Aviation Fuel
Location
United Kingdom
Services
HAZID
ENVID
Bowtie
MAH Register
Year
2024
Client
  • Velocys
Industry
  • Sustainable Aviation Fuel
Location
  • United Kingdom
Services
  • Bowtie
  • ENVID
  • HAZID
  • MAH Register
Year
  • 2024

The challenge

To address potential risks and hazards associated with the First of A Kind (FOAK) project during the Pre Front End Engineering Design (Pre-FEED) phase, Process Risk Consulting were commissioned to facilitate a Hazard Identification (HAZID) and Environmental Identification (ENVID) Workshops.

The scope of workshop included tie-ins with suppliers of Hydrogen, Carbon Dioxide (CO2) and raw water along with specialised vendor processes such as Fischer-Tropsch.

In addition to this, Process Risk Consulting prepared a Bowtie of the various hazards associated with Hydrogen and CO2 for the facility to visually represent the hazards and mitigations.

Using the outputs of the HAZID, ENVID and Bowtie studies, Process Risk Consulting prepared a Major Accident Hazards (MAH) register to allow designers of the next phase of the project to clearly identify what the MAH associated with the facility are and the required protections they would need to consider within the design.

As part of the HyNet North West Low Carbon Project, Eni will develop and operate offshore and onshore transportation and storage of CO2 captured from industrial sites in Northwest England at the Liverpool Bay offshore oil and gas facilities in line with its mission to transition towards a low-carbon future.

Client
Eni
Industry
Carbon Capture and Storage
Location
United Kingdom
Services
HAZID
ENVID
HAZOP
SIL Classification (via Risk Graph)
SIMOPS
Project Risk Assessment
Year
2024
Client
  • Eni
Industry
  • Carbon Capture and Storage
Location
  • United Kingdom
Services
  • ENVID
  • HAZID
  • HAZOP
  • Project Risk Assessment
  • SIL Classification (via Risk Graph)
  • SIMOPS
Year
  • 2024

The challenge

To address potential risks and hazards associated with the project during the Front End Engineering Design (FEED) phase, Process Risk Consulting were commissioned to facilitate the Project Risk Assessment, Hazard Identification (HAZID), Environmental Identification (ENVID), Simultaneous Operations (SIMOPS), Hazard and Operability (HAZOP) and Safety Integrity Level (SIL) Allocation Workshops , in line with ENI Guidelines for the Padeswood pipeline and associated facilities.

The scope of workshop included all of the onshore transport and storage facilities including several onshore pipelines and Above Ground Installations (AGI’s).

The West Nile Delta (WND) development includes 25 wells producing gas to the onshore processing plant via three long-distance subsea tie-backs. The onshore facilities have a total gas processing capacity of around 1.4 billion standard cubic feet of gas per day. All of the gas produced is fed into Egypt’s national grid.

Client
BP
Industry
Onshore Gas Processing
Location
Egypt
Services
HAZID
ENVID
HSSE Management Plan
Year
2024
Client
  • BP
Industry
  • Onshore Gas Processing
Location
  • Egypt
Services
  • ENVID
  • HAZID
  • HSSE Management Plan
Year
  • 2024

The challenge

As part of the upgrades within the BP WND facility, BP are undergoing a number of redevelopments and upgrades. As part of this a number of equipment items are being decommissioned, deconstructed, removed and replaced.

To address potential risks and hazards associated with the decommissioning, deconstruction and removal of the equipment items as part of the project , Process Risk Consulting were commissioned to facilitate a Hazard Identification (HAZID) and Environmental Identification (ENVID) Workshops.

In addition to the facilitation of the HAZID and ENVID workshops, Process Risk Consulting also developed a Health, Safety, Security and Environmental (HSSE) Management Plan to cover the decommissioning and deconstruction activities.

HNH is a large scale green ammonia project to be built in multiple phases, located in the Magallanes region of South Chile, with nearby access to a potential port site and abundant of potential land plots for further development.Â

The total project size is 3.5 GW onshore wind, 3 GW electrolyser and an estimated total production of 1.35 million tonnes of green ammonia per year.Â

Client
Velocys
Industry
Sustainable Aviation Fuel
Location
United Kingdom
Services
HAZID
ENVID
Bowtie
MAH Register
Year
2024
Client
  • HNH
Industry
  • Green Ammonia
  • Hydrogen
Location
  • Chile
Services
  • ENVID
  • HAZID
Year
  • 2023

The challenge

To address potential risks and hazards associated with the First of A Kind (FOAK) project during the Pre Front End Engineering Design (Pre-FEED) phase, Process Risk Consulting were commissioned to facilitate a Hazard Identification (HAZID) and Environmental Identification (ENVID) Workshop.

The scope of workshop included energy generation from wind, the generation of hydrogen from electrolysis and green ammonia production.

The project will see CO2 from enfinium’s flagship Ferrybridge, West Yorkshire incinerator captured and transported to Navigator’s Teesside storage facility which will then be transported offshore for permanent storage.

Client
  • Navigator Terminals
Industry
  • Carbon Capture and Storage
Location
  • United Kingdom
Services
  • ENVID
  • HAZID
Year
  • 2023

The challenge

To address potential risks for the first of a kind transport of Carbon Dioxide, Process Risk Consulting were commissioned to chair a Hazard Identification (HAZID) and Environmental Identification (ENVID) workshop for the project to cover the entire scope from emitter take-off to connection with the downstream operators injection pipeline in order to identify potential hazards, ensuring that they are suitably protected and mitigated.

As part of the HyNet North West Low Carbon Project, Eni will develop and operate offshore and onshore transportation and storage of CO2 captured from industrial sites in Northwest England at the Liverpool Bay offshore oil and gas facilities in line with its mission to transition towards a low-carbon future.

Client
Eni
Industry
Carbon Capture and Storage
Location
United Kingdom
Services
HAZID
ENVID
HAZOP
SIL Classification (via Risk Graph)
SIMOPS
Project Risk Assessment
Year
2024
Client
  • Eni
Industry
  • Carbon Capture and Storage
Location
  • United Kingdom
Services
  • ENVID
  • HAZID
Year
  • 2023

The challenge

To address potential safety and environmental risks and hazards associated with the project, Process Risk Consulting were commissioned to facilitate a series of Hazard Identification (HAZID) and Environmental Identification (ENVID) Workshop, in line with ENI Qualitative Risk Assessment guidelines – OPI-HSE-024-ENI-SPA-R01.

The scope of workshop included all of the onshore facilities, onshore pipelines, subsea pipelines, onshore conditioning and storage facilities, offshore platform and well injection.