Tees Green Hydrogen Phase 1 (FEED)

Tees Green Hydrogen is a collaboration between Hynamics and EDF Renewables. In its initial phase, the electrolyser will have upto 10MW capacity to generate hydrogen for the offtaker.

Client
Eni
Industry
Carbon Capture and Storage
Location
United Kingdom
Services
HAZID
ENVID
HAZOP
SIL Classification (via Risk Graph)
SIMOPS
Project Risk Assessment
Year
2024
Client
  • EDF Renewables
  • Hynamics
Industry
  • Hydrogen
Location
  • United Kingdom
Services
  • Environmental Permitting
  • Hazardous Substances Consent
  • Project Management Consultant
Year
  • 2025

The challenge

To address potential risks and hazards associated with the project during the Front End Engineering Design (FEED) phase, Process Risk Consulting were commissioned to facilitate the Project Risk Assessment, Hazard Identification (HAZID), Environmental Identification (ENVID), Simultaneous Operations (SIMOPS), Hazard and Operability (HAZOP) and Safety Integrity Level (SIL) Allocation Workshops , in line with ENI Guidelines for the Protos pipeline and associated facilities.

The scope of workshop included all of the onshore transport and storage facilities including several onshore pipelines and Above Ground Installations (AGI’s).