In today’s blog, we’ll explore the key factors that ensure an efficient and high-quality Hazard and Operability (HAZOP) assessment. HAZOP’s are not just regulatory requirements; they are fundamental for identifying and mitigating risks within complex processes. Our team of expert HAZOP facilitators have come together to break down the key aspects you need to consider in order to have a productive successful HAZOP session.

Understanding the role of a HAZOP

HAZOP is a core component of hazard evaluation in the process safety world. It one of several methods used for Process Hazard Analysis (PHA). It is designed to uncover potential hazards and qualitatively assess the effectiveness of existing safeguards. HAZOP focuses on the examination of processes to identify deviations from the intended operation. It should be remembered that a HAZOP is a qualitative assessment. The follow-on from a HAZOP, typically a LOPA provides a semi-quantitative analysis of risk and the adequacy of protective layers – however this will be explored in a separate blog.

The Importance of Quality in PHA

A quality Process Hazard Analysis (PHA) is critical for effective risk management. The history of PHAs is rooted in significant incidents such as the Bhopal disaster in 1984, which highlighted the catastrophic consequences of inadequate safety measures. This tragedy catalysed the development of more robust safety standards and regulations, leading to the establishment of organisations such as the Center for Chemical Process Safety (CCPS). Therefore having a high-quality HAZOP is crucial in ensuring hazards are identified and suitably mitigated.

Key Objectives of a HAZOP

The primary objective of  a HAZOP is to identify weaknesses and vulnerabilities in processes that could lead to undesirable outcomes, such as:

  • Injuries to personnel
  • Personnel fatalities
  • Environmental damage
  • Equipment damage resulting in financial impact
  • Operational disruptions
  • Damage to company reputation

By focusing on these objectives, organisations can enhance their safety programs and procedures significantly to minimise the impact.

Defining Objectives and Approach

Before diving into a HAZOP study, it’s crucial to define clear objectives and approaches tailored to the specific project at hand. The focus can vary significantly between capital projects and operating facilities.

Capital Projects vs. Operating Facilities

Capital projects often involve fundamental design vulnerabilities that need addressing early in the process. The objectives in these cases shift from identifying high-consequence scenarios at the early stages to detailing design specifics as more information becomes available. An important note should be added here, that the HAZOP is not a design review and should never be treated as such. In contrast, operating facilities focus primarily on meeting regulatory requirements and ensuring processes operate within acceptable risk thresholds. Where a re-validation HAZOP is being conducted on operating facilities, the focus may be on ensuring that the existing HAZOP is fit-for-purpose with no new hazards being introduced.

Planning for a HAZOP Session

Effective planning is essential for a successful HAZOP.  A Pre-HAZOP checklist is always useful to have. The core items that are required during the planning stage are:

  1. Ensure the availability of key disciplines on the workshop date.
  2. Availability of core documentation.
  3. Suitability of the workshop room and equipment.

Need a Pre-HAZOP checklist? Scroll to the bottom to download what we use for every HAZOP workshop.

Key Disciplines for HAZOP/LOPA

Successful HAZOP studies require the involvement of diverse disciplines. Key roles include:

  • HAZOP Facilitator / HAZOP Chair
  • HAZOP Scribe / HAZOP Secretary
  • Process Engineer
  • Operations and Maintenance Representative
  • Control and Instrumentation Engineers
  • Health, Safety, and Environmental (HSE) / Process Safety Engineer
  • Specialists for unique requirements such as Project Engineer, Electrical Engineer, Mechanical Engineer, Piping and Pipelines Engineer etc.

Each team member must possess a thorough understanding of their system’s design and dynamics, particularly under upset conditions.

Common Documentation Requirements

To minimise the time spent searching for information during the study, it is vital to ensure that the following documents ready:

  • Noded Process Flow Diagrams (PFDs) and Approved for HAZOP Piping and Instrumentation Diagrams (P&IDs)
  • Cause and effect diagrams
  • Alarm and Trip register
  • Process Safety Time calculations
  • Previous PHA recommendations and their statuses
  • Operating procedures (if available)
  • Emergency procedures (if available)
  • Accident history (if available)
  • Â

Addressing Design Information Gaps

One of the biggest challenges during HAZOP studies is dealing with design information gaps. Common issues include inaccurate or missing equipment tag numbers and incomplete design specifications. To mitigate these gaps:

  • Ensure all P&IDs are accurate and up-to-date. Ideally all P&ID’s should be approved for HAZOP.
  • Document control valve specifications, including failure positions and response to loss of power.
  • Clarify pump performance specifications, including block and discharge pressures.
  • Details of piping specifications including design pressures and temperatures.

Preparing for Detailed Discussions

Prior to the HAZOP session, prepare detailed discussions regarding potential impacts of various scenarios. This includes understanding how process changes affect system behavior, such as:

  • Loss of heating or cooling
  • Flow variations
  • Temperature fluctuations

Venue Selection Tips

The venue for a HAZOP study plays a significant role in its success. Here are some tips to consider when selecting a venue:

  • Choose a location away from day-to-day distractions so that members can’t pop back into the office to do some other work outside of the HAZOP setting.
  • Set up the room to facilitate interaction among team members.
  • Ensure adequate amenities are available, such as technology for remote participants, snacks, and whiteboards for brainstorming.

Incorporating Remote Team Members

With advancements in technology, including remote team members in HAZOP sessions has never been easier. To ensure a seamless experience:

  • Test all technology beforehand to avoid disruptions.
  • Ensure remote participants have access to all necessary documents.
  • Arrange for IT support to handle any technical issues swiftly.

Final Readiness Tips

As your HAZOP session approaches, consider these final readiness tips:

  • Predefine causes to focus discussions on critical scenarios.
  • Encourage team members to come prepared with questions and concerns.
  • Organise materials logically for easy access during the study.

Conclusion

In conclusion, preparing for a successful HAZOP requires meticulous planning, clear objectives, and a well-prepared team. By focusing on quality and efficiency, you can optimise your HAZOP and enhance the safety of your design and operations. Remember, the key to success lies in thorough preparation and effective communication among all team members.

We hope you found this guide helpful. If you have any questions or would like to discuss further, feel free to reach out. Don’t forget to download your Pre-HAZOP checklist below.

Download Our Pre-HAZOP Checklist