Hydrogen

The Barry Hydrogen Project will support the green hydrogen sector by producing and supplying green hydrogen for the decarbonisation of industrial operations around the Port of Barry. This strategic location, owned by Associated British Ports, has recently been designated as the site for the development of the Clean Growth Hub, aligning the collective vision of for sustainable growth and future across the Port of Barry.

Client
Eni
Industry
Carbon Capture and Storage
Location
United Kingdom
Services
HAZID
ENVID
HAZOP
SIL Classification (via Risk Graph)
SIMOPS
Project Risk Assessment
Year
2024
Client
  • Hynamics
Industry
  • Hydrogen
Location
  • United Kingdom
Services
  • CDM 2015
  • FMEA
  • HAZID
  • HSE Design Philosophy
  • HSE Management Plan
  • Quantitative Risk Assessment
  • Reliability Availability and Maintainability Study
  • Technical Safety Design
Year
  • 2025

The challenge

To address potential risks and hazards associated with the project during the Front End Engineering Design (FEED) phase, Process Risk Consulting were commissioned to facilitate the Project Risk Assessment, Hazard Identification (HAZID), Environmental Identification (ENVID), Simultaneous Operations (SIMOPS), Hazard and Operability (HAZOP) and Safety Integrity Level (SIL) Allocation Workshops , in line with ENI Guidelines for the Protos pipeline and associated facilities.

The scope of workshop included all of the onshore transport and storage facilities including several onshore pipelines and Above Ground Installations (AGI’s).

Tees Green Hydrogen is a collaboration between Hynamics and EDF Renewables. In its initial phase, the electrolyser will have upto 10MW capacity to generate hydrogen for the offtaker.

Client
Eni
Industry
Carbon Capture and Storage
Location
United Kingdom
Services
HAZID
ENVID
HAZOP
SIL Classification (via Risk Graph)
SIMOPS
Project Risk Assessment
Year
2024
Client
  • EDF Renewables
  • Hynamics
Industry
  • Hydrogen
Location
  • United Kingdom
Services
  • Environmental Permitting
  • Hazardous Substances Consent
  • Project Management Consultant
Year
  • 2025

The challenge

To address potential risks and hazards associated with the project during the Front End Engineering Design (FEED) phase, Process Risk Consulting were commissioned to facilitate the Project Risk Assessment, Hazard Identification (HAZID), Environmental Identification (ENVID), Simultaneous Operations (SIMOPS), Hazard and Operability (HAZOP) and Safety Integrity Level (SIL) Allocation Workshops , in line with ENI Guidelines for the Protos pipeline and associated facilities.

The scope of workshop included all of the onshore transport and storage facilities including several onshore pipelines and Above Ground Installations (AGI’s).

HNH is a large scale green ammonia project to be built in multiple phases, located in the Magallanes region of South Chile, with nearby access to a potential port site and abundant of potential land plots for further development.Â

The total project size is 3.5 GW onshore wind, 3 GW electrolyser and an estimated total production of 1.35 million tonnes of green ammonia per year.Â

Client
Velocys
Industry
Sustainable Aviation Fuel
Location
United Kingdom
Services
HAZID
ENVID
Bowtie
MAH Register
Year
2024
Client
  • HNH
Industry
  • Green Ammonia
  • Hydrogen
Location
  • Chile
Services
  • ENVID
  • HAZID
Year
  • 2023

The challenge

To address potential risks and hazards associated with the First of A Kind (FOAK) project during the Pre Front End Engineering Design (Pre-FEED) phase, Process Risk Consulting were commissioned to facilitate a Hazard Identification (HAZID) and Environmental Identification (ENVID) Workshop.

The scope of workshop included energy generation from wind, the generation of hydrogen from electrolysis and green ammonia production.