About The Project
Located approximately 155 miles (250 km) from Abu Dhabi, UAE, the Fujairah LNG facility will include an LNG plant with a total capacity of 9.6 million tons per annum (Mtpa).
The facility, will include two 4.8 million mt/year trains, which will raise ADNOC’s LNG production capacity to 15.6 million mt/year.
Scope of Work
Process Risk Consulting were commissioned to provide Project Management Consultancy (PMC) services during the fast-track Front End Engineering Design (FEED) through providing their expertise to manage the delivery of the Health, Safety and Environment Impact Assessment (HSEIA) from the subcontractor in order to ensure that hazards are adequately identified and risks managed to As Low As Reasonably Practicable (ALARP) in accordance with the ADNOC standard – HSE-RM-ST02.
The scope of the HSEIA included:
- Process Hazard Assessment (PHA) consisting of Hazard Identification (HAZID), Environmental Identification (ENVID) and Occupational Health Identification (OHID),
- Inherently Safer Design (ISD),
- Hazard and Operability (HAZOP),
- Safety Integrity Level (SIL) Determination using Layers of Protection Analysis (LOPA),
- Air Emissions Dispersion Study,
- Fire and Explosion Risk Assessment (FERA),
- Environmental Baseline Study,
- Environmental Scoping Report (within 30 days on award of contract),
- Coarse Quantitative Risk Assessment (QRA) (within 30 days on award of contract),
- Social Impact Assessment (SIA) Screening (within 30 days on award of contract),
- QRA,
- Building Risk Assessment (BRA),
- Escape, Evacuation and Rescue Analysis (EERA),
- Emergency Systems Survivability Assessment (ESSA),
- Ground Flare Hot Plume Computational Fluid Dynamics (CFD) Study,
- Ventilation Study,
- Ergonomics Study,
- Waste Management Plan,
- Simultaneous Operations (SIMOPS),
- Project Health, Safety and Environment Review (PHSER) 1 and 2,
- Energy Review,
- Bow-Tie,
- Control of Major Accident Hazards (COMAH),
- Major Accident Hazards (MAH) Register,
- Buildings Fire and Safety Review in accordance with UAE legislation,
- Best Available Techniques (BAT),
- Decommissioning Environmental Management Plan (DEMP),
- Human Factors Engineering (HFE) FEED Plan,
- HFE Integration Plan (HFEIP),
- Task Requirement Analysis (TRA),
- Greenhouse Gas (GHG) Assessment,
- Operational Noise Assessment,
- Construction Noise and Vibration Assessment,
- E-HAZOP / Safety and Operability (SAFOP),
- HSEIA Screening Report,
- Valve Criticality Analysis (VCA),
- Dropped Objects Study,
- ALARP Study,
- HSECES Performance Standards,
- HSEIA Hazard and Effects Register,
- HSE Critical Activities Report,
- CFD Blast Overpressure Assessment,
- Social Work Plan,
- Predictive Human Error Analysis (PHEA) Report,
- HSEIA Report.