KLA plans to build a new Research and Development (R&D) laboratory and manufacturing facility for semiconductors to meet increased demand.
Client
Saudi Aramco
Industry
Offshore Oil and Gas
Location
Saudi Arabia
Services
HAZID
HAZOP
LOPA
Year
2024
Client
- KLA
Industry
- Semiconductor
Location
- United Kingdom
Services
- LOPA
Year
- 2023
The challenge
To address potential risks and hazards associated with the project during the RIBA 4 phase of the project, Process Risk Consulting were commissioned to conduct the Safety Integrity Level (SIL) Allocation study using the Layers of Protection Analysis (LOPA) methodology for the Safety Instrumented Functions (SIF’s) used as part of the manufacturing process of the semiconductors.